“Rail Roko Aandolan” in Surat for long time pending issues related with railway

On behalf of various issues related to Gujarat State and the long time pending issues related to railway , “RAIL ROKO ANDOLAN” got a favourable response. More than 1.5 lakh people participated in this agitation wherein trains were stopped from Bharuch to Vapi and Surat to Songadh.Eventually for the below mentioned issues written confirmation was given by the Railway Board and are taken care of.

1)      Repairs of Varachha over bridge.

2)      Regarding double track at Udhna-Jalgaon track.

3)      Cleanliness of Surat Railway Station.

4)      To increase the railway quota.

5)      To increase the Surat-Bhusawal passenger train’s coaches.

6)      To amend the timings of Bhilad-Bhusawal Express Train.

7)      To resume the New-Shatabdi  train from Surat to Bandra Terminal.

8)      To provide basic facilities at all railway stations.

9)      To extend intercity from Valsad to Vadodara.

10)   Regarding development of Udhna Railway Station as a passenger terminal.

11)   Regarding Surat as stoppage for August-Kranti.

12)   Regarding various issues like the introduction of new trains , extension of trains , providing stoppages etc.

Leave a Reply

*

News
Read More News

Facebook Updates

  • TWEETER STUFF

    • The RSS feed for this twitter account is not loadable for the moment.

    Follow @CRPaatil on twitter.

    • Follow us on C R Patil

      • Facebook
      • Twitter
      • Youtube
    Copyright 2012. All rights reserved. C R Paatil